All about civil construction knowledge- PARAM VISIONS

How to calculate the plywood required for column shuttering?/Estimating the quantity of plywood for formwork.

 After calculating the shuttering area of columns & beams, we can find out the no. of plywood required to cover that area.

Before proceeding further,

Go through the article 👇

👀.  How to calculate the shuttering area of columns?

In the above article, we have already estimated the shuttering area of a column. Let us now calculate the plywood requirement for the shuttering work of 5 nos. of similar-sized columns. 



Given data:

Shuttering area  = 3.48m².

No. of columns = 5 nos.


Calculation:

As we know,

The size of one plywood = 4 ft. х 8 ft.

The area of one plywood 

= [length х breadth]

= [4 ft. х 8 ft.]

= 32 sq. ft.

Converting the area in m².

= [32 х 0.092903]

= 2.973 m².

(As 1 sq. ft. = 0.092903  m².)


No. of plywood required

= [(shuttering area of one column х no. of columns) ÷ area of one plywood]

= [ (3.48m². х 5 nos.) ÷ 2.973m².]

= [17.4m². ÷ 2.973m².]

= 5.85nos.

By rounding off,

The no. of plywood required = 6nos.


To go through all types of quantity estimate articles, click here.

 Thank you for going through these calculation steps. Have a good day 😄.

Share:

No comments:

Post a Comment

Translate

Blog Archive

popular posts

Recent Posts

Google search